• Knowing and mastering the S4000P specification in order to develop a preventive maintenance plan for a complex product.
• Introduction to ASD and the S4000P specification.
• Development of the preventive maintenance plan with system, structure, zonal and L/HIRF analyses.
• Preventive maintenance plan optimisation.
• Interface and data exchange model.
S4000P: Building and optimising the preventive maintenance plan of a product
OBJECTIVES
PROGRAMME
DAY 1
INTRODUCTION TO ASD AND S4000P
• Understanding ASD specifications,
• Understanding the objectives and stakes of S4000P,
• General structure of S4000P.
S4000P METHODOLOGY
• Objectives and definition,
• Organisation,
• Structure of the S4000P analysis.
SYSTEM ANALYSIS
• Candidate selection,
• Logical tree and failure categorisation,
• Identification of maintenance tasks and their intervals.
Practical workshops: conducting a system study
DAY 2
SPECIAL EVENTS
• Analysis of special events,
• Link with S3000L.
OPERATIONAL FEEDBACK
• Preparation phase,
• Analysis and follow-up phase.
INTERFACE AND DATA EXCHANGE MODEL
• Interface with other ASD specifications.
DAY 3
STRUCTURAL ANALYSIS
• Candidate selection,
• Accidental damage analysis,
• Environmental damage analysis,
• Fatigue analysis.
ZONAL / L/HIRF ANALYSIS
• Standard zonal analysis,
• Detailed zonal analysis,
• Analysis of protection against
electromagnetism and lightning,
• Interface analysis.
Practical workshops: conducting a structural and zonal study
PROFILE
ILS Manager, LSA analyst, ISS or MRO Manager.
PREREQUISITES
Knowledge of the maintenance environment.