Ingénierie de Maintenance/SLI/MCO

S4000P: Building and optimising the preventive maintenance plan of a product

01
01

OBJECTIVES

• Knowing and mastering the S4000P specification in order to develop a preventive maintenance plan for a complex product.
• Introduction to ASD and the S4000P specification.
• Development of the preventive maintenance plan with system, structure, zonal and L/HIRF analyses.
• Preventive maintenance plan optimisation.
• Interface and data exchange model.

02
02

PROGRAMME

DAY 1

INTRODUCTION TO ASD AND S4000P
• Understanding ASD specifications,
• Understanding the objectives and stakes of S4000P,
• General structure of S4000P.


S4000P METHODOLOGY
• Objectives and definition,
• Organisation,
• Structure of the S4000P analysis.


SYSTEM ANALYSIS
• Candidate selection,
• Logical tree and failure categorisation,
• Identification of maintenance tasks and their intervals.


Practical workshops: conducting a system study

DAY 2

SPECIAL EVENTS
• Analysis of special events,
• Link with S3000L.


OPERATIONAL FEEDBACK
• Preparation phase,
• Analysis and follow-up phase.


INTERFACE AND DATA EXCHANGE MODEL
• Interface with other ASD specifications.

 

DAY 3

STRUCTURAL ANALYSIS
• Candidate selection,
• Accidental damage analysis,
• Environmental damage analysis,
• Fatigue analysis.


ZONAL / L/HIRF ANALYSIS
• Standard zonal analysis,
• Detailed zonal analysis,
• Analysis of protection against
electromagnetism and lightning,
• Interface analysis.


Practical workshops: conducting a structural and zonal study

03
03

PROFILE

ILS Manager, LSA analyst, ISS or MRO Manager.

 

04
04

PREREQUISITES

Knowledge of the maintenance environment.